Building a home, in stages

A construction loan pays the builder as the house rises, not all at once. You pay interest only on what has been drawn, so the loan grows with the frame.

  1. Slab
  2. Frame
  3. Lockup
  4. Fixing
  5. Completion
Slab, frame, lockup, fixing, completion. Each stage is inspected before it is paid.
Step by step

How it unfolds.

  1. Before the slab

    Plans and approval

    A fixed price building contract, plans, the builder licence and warranty insurance, and council approval. The lender values the finished home from the plans, as if complete, and approves the loan for the whole build up front.

  2. Progress payments

    Stage by stage

    Typically five stages: slab, frame, lockup, fixing and completion. At each stage the builder invoices, the lender inspects, and the payment goes straight to the builder. You approve each drawdown; we chase each inspection so the build never waits on the bank.

  3. Keys and conversion

    The home is yours

    Final inspection, occupancy certificate, last payment. The construction loan becomes an ordinary home loan with the structure we planned at the start, and the repayments settle into their long rhythm.


Builds run long more often than they run short. We plan for a buffer from the first conversation, so a slow month never becomes a crisis.

General information only. This explainer does not take into account your personal needs and requirements. Your full financial situation needs to be considered before any offer and acceptance of a loan product, and lender policy, conditions, fees and charges will apply. Talk to us about your own situation.